Product Detail :
|
Consultancy services for authority’s engineer for supervision construction of four laning of part of ramban to banihal section of nh-1a (now nh-44), from ch.154+210 to ch.158+675(north bound) and from ch.155+940 to ch.160+282(south bound) including construction of twin tube tunnel (package-i). construction of four laning of part of ramban to banihal section of nh-1a (now nh-44), from ch.158+675 to ch.164+660 (north bound) and ch.160+282 to ch.163+368 (south bound connecting with existing tunnel- t4) excluding ch.161+544 to ch.164+100 (north bound) including construction of twin tube tunnel (package-ii). construction of four laning of part of ramban to banihal section of nh-1a (now nh-44), from ch.165+092 to ch.171+855 (north bound) and from ch.166+895 to ch.173+638 (south bound), excluding section from ch.166+610 to ch.167+150 (north bound), ch.168+425 to ch.168+935 (south bound) and section from ch.167+960 to ch.168+168 (north bound), ch.169+745 to ch.169+951 (south bound) (package-iii) in the ut of jammu & kashmir on epc mode.
|