| 
                                                    Product Detail :
                                                 | 
	
                                                    C102-part design and construction of balance works of package ca06, elevated viaduct and 5 elevated stations viz. mtnl metro, s. g. barve marg, kurla east, eeh and chembur (excluding architectural finishing and pre-engineered steel roof structure of stations) from chainage 46860.384m to chainage 52729.312 of line 2b (d.n nagar-mandale) of mumbai metro rail project of mmrda.
                                                 |