Product Detail :
|
NHIDCL/Meghalaya/NH-51/ Tura Bypass/2025 Construction to 2-Lane with Paved Shoulder of Tura Bypass starting from existing Km 57.500 of NH-127B and ending at existing Km 108.750 of NH- 217 (Length-29.030 Km) on Hybrid Annuity Mode in the state of Meghalaya.
|
Tender Detail : |
NHIDCL/Meghalaya/NH-51/ Tura Bypass/2025 #*. Construction to 2-Lane with Paved Shoulder of Tura Bypass starting from existing Km 57.500 of NH-127B and ending at existing Km 108.750 of NH- 217 (Length-29.030 Km) on Hybrid Annuity Mode in the state of Meghalaya. |