|
Product Detail :
|
Tender for Select Developers for the Assured Peak Supply of 4, 800 Mwh (1, 200 Mw X 4 Hours) of Firm and Dispatchable Renewable Energy From Interstate Transmission System-connected Projects with Co-located Energy Storage Systems (fdre-ix).
|
| Tender Detail : |
Seci Floats Tender for 4.8 Gwh of Peak Power Supply |